The company has designed WWTP for industrial zone Triangle near Žatec. The designed capacity is 40 m3/h and fulfills the local authorities requests for discharging to Ohře river.
The project documentation has been created from scratch and includes:
- Documentation for zoning permit
- Report for the EIA project
- Documentation for building permit
- Realization documentation
- Local authorities negotiations
The drawings have been done in 3D.