Print

 

The company has designed WWTP for industrial zone Triangle near Žatec. The designed capacity is 40 m3/h and fulfills the local authorities requests for discharging to Ohře river.

The project documentation has been created from scratch and includes:

 

The drawings have been done in 3D.